SITE PROGRESS UPDATE AUGUST 2022

A significant transition occurred last month with stadium access changes at gates 1, 2 and 3. A centralised gate was created at the south (or Southern Cross Station) end of the stadium to allow work on the structural steel and slabs to continue either side. The vast outline of the new structure can be clearly seen as you enter the stadium. All ticket holders with access through ‘Gate 1’ and ‘Gate 3’ will now enter via the centralised ‘Gate 1, 2 and 3’. This new entry is the final entry position for the project.

Gate 5 City Edge has also seen significant progress with structural steel installed and concrete slabs being poured. If you walk along the concourse, the shape of the exciting new hospitality spaces can be seen.

Thank you for your patience while construction is underway. The team are doing everything possible to ensure disruption is minimised.